Perancangan Perawatan Mesin Cetak Offset Dengan Pendekatan RCM, (Reliability Centered Maintenance)

(Studi Kasus Pada Cv Madyotomo Jawa Tengah)

Authors

  • Apif Sofyan Universitas Duta Bangsa Surakarta
  • Indah Wahyu Utami Universitas Duta Bangsa Surakarta
  • Ringgo Ismoyo Buwono Universitas Duta Bangsa Surakarta

DOI:

https://doi.org/10.59061/repit.v1i3.378

Keywords:

Preventive Maintenance, Komori L-425BP Machine, Productivity

Abstract

Machines play a crucial role in a production process, highlighting the need for maintenance to ensure their proper functioning. The methods employed include Fault Tree Analysis (FTA), Failure Mode and Effect Analysis (FMEA), and distribution determination. The repair times for each CMYK component are as follows: the bearing component requires 93.541 hours or 4 days, Griver needs 163.235 hours or 7 days, the seal requires 195.349 hours or 9 days, the linner pen needs 248.803 hours or 10 days, and the ink tank needs 260.123 hours or 11 days.

References

Asosiasi, B. B. (2021). Prediksi Persediaan Bahan Baku untuk Produksi Percetakan Menggunakan Metode Asosiasi. Paradigma, 23(1).

Azwir, H. H., Wicaksono, A. I., & Oemar, H. (2020). Manajemen Perawatan Menggunakan Metode RCM Pada Mesin Produksi Kertas. Jurnal Optimasi Sistem Industri, 19(1), 12-21.

Fahrezi, R. (2022). PERMASALAHAN DAN SOLUSI PADA UNIT PEMBASAH MESIN CETAK OFFSET ROTOMAN 50 DI PT. GRAFIKA MULTI WARNA (Doctoral dissertation, Politeknik Negeri Media Kreatif).

Inderawibowo, Z. A., & Syahrullah, Y. (2019). Analisis Overall Equipment Effectiveness Dan Six Big Losses Dengan Identifikasi Risiko Dan Peluang Berbasis Iso 9001: 2015 Pada Machining Center Pt. Surya Toto Indonesia. SURYA TOTO INDONESIA, TBK. CIEHIS Prosiding, 1(1), 275-282.

Iriani, Y., & Rahmadi, E. S. (2011). Usulan Waktu Perawatan Berdasarkan Keandalan Suku Cadang Kritis Bus di Perum Damri Bandung.

Jumlah Jam Overtime Pada Produksi Barang di PT Asahi Best Base Indonesia (ABBI) Bekasi. Jurnal Informatika SIMANTIK, 1(1), 1-11.

Mayangsari, D. F., Adianto, H., & Yuniati, Y. (2015). Usulan Pengendalian Kualitas Produk Isolator Dengan Metode Failure Mode and Effect Analysis (Fmea) Dan Fault Tree Analysis (Fta). Reka Integra, 3(2).

Mulyanto, A. (2016). Penerapan Metode Fuzzy Tsukamoto Untuk Menentukan Jumlah Jam Overtime Pada Produksi Barang di PT Asahi Best Base Indonesia (ABBI) Bekasi. Jurnal Informatika SIMANTIK, 1(1), 1-11.

Prasetyaningsih, E., Ruchiyat, I., & Muhammad, C. R. (2020). Penentuan Interval Waktu Perawatan Mesin Blowing dan Mesin Filling Menggunakan Teori Reliability dan Model Age Replacement (Studi Kasus pada PT. XYZ):-. Jurnal Sistem Teknik Industri, 22(2), 1-12.

Pratama, R. A. (2019). Minimasi Downtime Mesin Dryer dengan Reliability Centered Maintenance di PT Papertech Indonesia Unit II (Doctoral dissertation, Skripsi, Universitas Muhammadiyah Magelang).

Pasaribu, M. I., Ritonga, D. A. A., & Irwan, A. (2021). Analisis Perawatan (Maintenance) Mesin Screw Press Di Pabrik Kelapa Sawit Dengan Metode Failure Mode And Effect Analysis (FMEA) Di PT. XYZ. JiTEKH, 9(2), 104-110.

Pratama, M. A., Kurniawan, F. A., & Irwan, A. (2020). Analisis Penerapan Total Productive Maintenance (Tpm) Melalui Metode Overall Equipment Effectiveness (OEE) Pada Mesin Packer Di Pabrik Semen Pt. Xyz. JiTEKH, 8(1), 11-21.

Rahmawan, A., Ma’rifat, T. N., & Azka, A. B. F. (2021). EFISIENSI PROSES PRODUKSI MELALUI ANALISIS DOWNTIME PADA PROSES PACKAGING (STUDI KASUS: CARGILL INDONESIA PLANT). Agroindustrial Technology Journal, 4(2), 157-166.

Susanto, A. D., & Azwir, H. H. (2018). Perencanaan Perawatan Pada Unit Kompresor Tipe Screw Dengan Metode RCM di Industri Otomotif. Jurnal Ilmiah Teknik Industri, 17(1), 21-35.

Saori, S., Anjelia, S., Melati, R., Nuralamsyah, M., & Djorghi, E. R. S. (2021). Analisis Pengendalian Mutu Pada Industri Lilin (Studi kasus Pada PD. Ikram Nusa Persada Kota Sukabumi). Jurnal Inovasi Penelitian, 1(10), 2133-2138.

Siregar, N., & Munthe, S. (2019). Analisa Perawatan Mesin Digester dengan Metode Reliabity Centered Maintenance pada PTPN II Pagar Merbau. JIME (Journal of Industrial and Manufacture Engineering), 3(2).

Wuryanto, W., & Wahid, A. (2018). Analisis total predictive maintenance dengan metode oee (overall equipment effectiveness) guna meningkatkan performa pada mesin husky (pt. xy gempol). JKIE (Journal Knowledge Industrial Engineering), 5(1), 7-12

Downloads

Published

2023-08-10

How to Cite

Apif Sofyan, Indah Wahyu Utami, & Ringgo Ismoyo Buwono. (2023). Perancangan Perawatan Mesin Cetak Offset Dengan Pendekatan RCM, (Reliability Centered Maintenance): (Studi Kasus Pada Cv Madyotomo Jawa Tengah). Jurnal Rekayasa Proses Dan Industri Terapan, 1(3), 241–252. https://doi.org/10.59061/repit.v1i3.378

Most read articles by the same author(s)

Similar Articles

You may also start an advanced similarity search for this article.